Gate Theatre

Gate Theatre2019-07-01T07:32:10+00:00

Project Description

Construction of new rehearsal rooms, offices, workshops and staff areas adjoined to the existing building. This modern Architectural design blended in perfectly with the existing surrounding buildings and ultimately achieved an Opus award
This was a very complex project with high-spec external finishes to blend with adjoining buildings. The site boundary merged with the Rotunda Hospital and strict guidelines were set in place to ensure that critical deliveries to the hospital were never disrupted.

Project Details

Categories:

Construction Period:

21 months

Value:

€5 million

Location:

Cavendish Row, Dublin 1

Client:

Gate Theatre

Project Architect:

Scott Tallon Walker

Project Engineer:

Arup Consulting Engineers

Quantity Surveyor:

Peter Curtin & Associates